Heavy steel structure, fixed type — pusher & coke side
Key Advantages
Highest Efficiency
Superior tar & carbon removal vs mechanical methods
Seal Protection
Complete protection of door seals — no damage
Low Maintenance
Fully automated cycle, minimal annual upkeep
System Components
Each system is a fully integrated package — ready for installation and commissioning.
Roller carriage with 3 hydro-jet nozzles on circular track
Motor, sprocket, pin rack drive system
600 Bar pump, booster, filter, tank, diverter valves
Vane pump, oil tank, solenoid valves, manifold
Positioning guides for door extractor alignment
Debris collection, water drainage system
Manual/automatic operation, push-button controls
Completed Installations
TATA Steel, Jamshedpur
Fixed Station — Coke & Pusher Side
TATA Steel, Kalinga Nagar
Fixed Station — Coke & Pusher Side
IISCO Steel
Fixed Station — Coke & Pusher Side
Bhilai Steel Plant (SAIL)
Fixed Station — Coke & Pusher Side
Bokaro Steel Plant (SAIL)
Fixed Station — Coke & Pusher Side
Durgapur & Rourkela (SAIL)
Fixed Station — Coke & Pusher Side